How to set piers for my deck in Lee’s Summit Missouri

Here at Longhorn Decks in Lee’s Summit, MO we take the process of building a deck very serious. Lets Start with the Foundation or piers of the decks we build in Lee’s Summit, MO

Pouring piers for a deck is a foundational step in the construction process that ensures the structure’s stability and longevity. Here’s a comprehensive guide to help you understand and execute the task effectively: We are located in Lee’s Summit, MO we account for all four season (weather),

Planning and Preparation

1. Design and Layout:

  • Determine the number of piers needed based on the deck’s size and design.
  • Mark the locations using stakes or spray paint.

2. Local Building Codes:

We have a great relationship with the City of Lee’s Summit to verify building requirements and to help the customer in Lee’s Summit with the process of contacting the City.

  • Check for any regulations concerning depth, width, and type of piers.
  • Obtain necessary permits.

3. Materials and Tools:

  • Ready-mix concrete or cement, sand, and gravel.
  • Cardboard forming tubes or wooden forms.
  • Rebar or mesh for reinforcement.
  • Shovels, trowels, and digging equipment.
  • A level, measuring tape, and a long straight board.

4. Site Preparation:

  • Clear the area of debris and vegetation.
  • Level the ground where piers will be placed.

Excavation

1. Digging Holes:

  • Excavate holes at marked spots, considering frost line depth to prevent heaving.
  • The diameter should be at least three times the size of the post for stability.

2. Clean and Level:

  • Ensure the bottom of the hole is flat and compacted.
  • Use a level to check the base.

Creating Forms

1. Form Tubes:

  • Cut the cardboard forming tubes to required lengths.
  • Place in the hole and adjust to ensure they are vertical and level.

2. Wooden Forms (Alternative):

  • Assemble wooden forms if tubes are not preferred.
  • Ensure they are square and level.

Reinforcement

1. Adding Rebar:

  • Place rebar vertically in the form to reinforce the concrete.
  • Tie horizontal rebar or wire mesh for additional strength.

Pouring Concrete

1. Mixing Concrete:

  • Mix concrete to the manufacturer’s specifications.
  • Ensure a consistent and workable mix.

2. Filling Forms:

  • Pour concrete into the forms, using a shovel or hoe to spread it.
  • Tap the sides of the forms to eliminate air pockets.

3. Leveling and Finishing:

  • Overfill the form slightly, then level it off with a straight board.
  • Smooth the surface with a trowel for a finished look.

Curing and Post-Installation

1. Curing Process:

  • Allow the concrete to cure for at least 48 hours.
  • Keep the surface moist to prevent cracking during the curing process.

2. Removing Forms:

  • After the concrete has cured, carefully remove the forms.
  • Check the piers for any irregularities and make necessary touch-ups.

3. Attaching Posts:

  • Secure post bases into the wet concrete or drill and anchor after curing.
  • Attach posts to the bases, ensuring they are plumb and level.

Final Considerations

  • Inspect the piers for any signs of cracking or movement over time.
  • Consider using adjustable post bases to account for any settling.
  • Regular maintenance checks will help prolong the life of your deck.

Pouring piers is a critical step that requires precision and attention to detail. By following this guide, you can create a sturdy foundation that will support your deck for years to come.

Please call Zach at 816-674-7058 for any questions on building your new deck in Lee’s Summit, MO.